CASE STUDY: Camberley Signs
Client: Camberley Signs
Sector: Printing
Services: Industrial Electrical Installations, Machine Relocation, Compressor Electrical Supply, Three-Phase Power, Manufacturing
Location: Hampshire
Services: Signage & Wayfinding, Retail Displays & Joinery, Construction & Hoarding Branding, Digital & Vinyl Printing
Electrical Services Outcome: New laser machinery successfully powered, connected and tested, with three-phase extraction integrated and the workshop ready for operation.
“We have been using LS Electrical for over 20 years and have always found them reliable, knowledgeable and professional. So, when we purchased a new laser machine for our workshop, LS Electrical were our go-to electricians for the installation. Their experience with industrial electrical installations and three-phase power meant they could take care of everything from disconnecting the old equipment to connecting and testing the new laser and extraction system. As always, the work was completed professionally and with minimal disruption to our operations.”
Camberley Signs
LS Electrical has supported Camberley Signs with its electrical requirements for more than 20 years. When the company invested in a new laser cutting machine, our team carried out the industrial electrical installation required for the new equipment, including modifications to the existing supply and three-phase power for the extraction system.
About Camberley Signs
Camberley signs is a commercial signage, digital printing, and bespoke joinery company established in 1978. Operating from Yateley (near Blackbushe Business Park), they provide complete end-to-end services, from initial design and manufacturing to final installation for retail, corporate, and construction sectors.
Core services include:
- Signage & Wayfinding
- Retail Displays & Joinery
- Construction & Hoarding Branding
- Digital & Vinyl Printing

The Challenge
The client was replacing the main laser machine within their workshop with a new unit that had different electrical load and supply requirements. The existing electrical supply serving the original machine therefore needed to be safely disconnected and removed, with the installation altered to provide the correct power requirements for the replacement equipment.
The project also required coordination around the installation of the new machinery, ensuring that the necessary three-phase power and associated supplies, including the extraction system, were available and correctly configured before the equipment could be put into operation.

The Solution
LS Electrical initially attended the workshop to safely isolate and remove the electrical supply to the existing laser machine. The electrical installation was then modified to accommodate the load requirements of the new equipment, with the necessary supplies connected back to a local distribution board.
Once the new laser had been positioned and installed, our electricians returned to complete the final electrical connections. This included connecting the machine and its three-phase extraction system, followed by the appropriate electrical testing and verification to ensure the new installation was safe and ready for operation.
By coordinating the electrical work around the machinery replacement, LS Electrical provided the client with a complete electrical solution from initial disconnection and supply alterations through to final connection and testing.